Project Overview
- Solicitation
Type: - Request for Proposals (RFP)
- Solicitation
Issue Date: - January 23, 2019
- Deadline for
Proposals: - 2:00 PM (Eastern), February 27, 2019
- Submission
Location: - 45025 Aviation Drive, Suite 240, Dulles Airport
- Estimated
Dollar Value: - $250,000 - $300,000
- Project
Duration: - 180 days from Notice to Proceed
- Bond
Requirements: - 100% Payment, 100% Performance
- Project
Summary: - The Contractor shall furnish all necessary design, labor, materials, tools, parts, equipment and supervision to remediate excessive infiltration and inflow discharging into the south area sanitary sewer system by replacing fifteen manholes with new watertight, bolt down frames and covers at Washington Dulles International Airport.
- LDBE
Requirement: - This solicitation has a 100% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 30% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Airports Authority's Department of Supplier Diversity at 703-417-8660.
- LDBE Size
Standards: -
NAICS Code Type of Work / Service LDBE Size Standard 237110 Sanitary Sewer Construction $36.5 Million 541330 Engineering Design Services $15.0 Million - Amendments
Issued: - None
Solicitation Events
- Pre-Proposal Conference:
- Date: February 5, 2019
Time: 10:00 AM (Eastern)
Location: Conference Room B, Third Floor, 45045 Aviation Drive, Dulles Airport - Pre-Proposal Conference Documents:
- Pre-Proposal Conference Attendees List (67 KB)
Pre-Proposal Conference Safety Presentation (459 KB)
Questions and Answers
- Deadline:
- All questions must be submitted by 3:00 PM (Eastern) February 13, 2019.
- Question Submission:
- The deadline for submitting questions has passed.
No further questions will be accepted. - Answered Questions:
- Questions and Answers - February 21, 2019 (4.77 MB)
Registration & Planholders List
- Details:
- Show your interest in this solicitation by registering as a Planholder.
Registration will place your name on the Planholder List for this project and ensure that you receive notification of any amendments or other updates to the project which may be issued in the future. - Registration:
- CLICK HERE TO REGISTER
Please enter "RFP-18-32655" in the Solicitation Number field. - Planholder List:
- Planholder List - February 27, 2019 (8 KB)
Solicitation Documents
- Registration:
- If you download the solicitation documents and are interested in submitting a response, please register as a planholder by clicking on the "Registration & Planholders" tab above and following the instructions.
PLEASE NOTE: If you fail to register, you will not receive notification of amendments, and failure to receive and acknowledge amendments may result in your submission being deemed non-conforming. - Base Solicitation Documents:
- RFP-18-32655 (674 KB)
Price Schedule (34 KB)
Attachment 4: Construction Safety Manual - Revision 17 - February 2016 (2.03 MB)
Attachment 4a: Construction Safety Manual - Forms Update Supplement - August 2018 (815 KB)
Attachment 5: Aviation Owner Controlled Insurance Program Manual - November 2018 Edition (3.66 MB)
Attachment 6: Orders and Instructions - Washington Dulles International Airport - Amendments to Solicitation:
- None
Help and Technical Assistance
- File Formats:
- Documents are in one or more of the following formats:
Adobe Acrobat PDF - Requires Adobe Reader version 5.0 or later.
You can download the latest version of Adobe Acrobat Reader free of charge by clicking on the following link: Download Acrobat Reader
Microsoft Excel - Requires Microsoft Excel 2000 or later.
Microsoft Word - Requires Microsoft Word 2000 or later. - Technical Assistance:
- If you have any technical questions or need assistance with the document download process, please contact us via e-mail at [email protected] or call 703-417-8672.
Last Updated February 27, 2019
The documents posted on this page and the information contained therein shall not be published or redistributed in any medium without prior written consent of the Metropolitan Washington Airports Authority.