The AeroTrain replaced most of the current Mobile Lounge system that were used to transport passengers between the Main Terminal and the Midfield Concourses. The train operates on an underground dual track system. The AeroTrain carries passengers between the Main Terminal and the A, B, and C-Gates. The stations are located at convenient points along the concourses to minimize walking distances to the airline gates. AeroTrain opened to passengers on January 26, 2010.

Click on the map below to view a full size image

 

 

aerotrain map

Statistics about the AeroTrain:

  • Total Number of vehicles: 29
  • Waiting Time Between Trains: Approximately 2 minutes in peak travel times
  • Maximum Speed: 42 miles per hour
  • Travel Time between Stations: 72 seconds

Construction Details:

  • Estimated Program Cost: $1.4 billion - entire project including tunnels and stations
  • Construction: Completed in 2009
  • Opening Date: January 26, 2010

 

Downloadable materials

Maps and Graphics

Factsheets about the Completed Project

Factsheets used during Project Construction

High-Resolution JPEG Photographs

Formatted Document (PDF) showing the 5 Photographs listed above

Formatted List (PDF) of MWAA Board and Management when AeroTrain opened (2010)

Photo Galleries showing AeroTrain construction progress

Editorial Section(s)