Project Overview
- Solicitation
Type: - Request for Information (RFI)
- Solicitation
Issue Date: - April 26, 2017
- Deadline for
Submissions: - 5:00 PM (Eastern), May 24, 2017
- Background:
- With current loads at approximately 34 megawatts, the Airports Authority is exploring options to reduce Washington Dulles International Airport's overall energy cost and mitigate impacts of an electrical grid outage. It is anticipated the back-up power requirements will be approximately 50-60% of the current load profile. With adequate back-up power, during a major electrical gird outage, Dulles will remain operational supporting the region and surrounding communities as a critical infrastructure and locale of last resort for unplanned man made or weather related events. Facilities that would need to operate during an outage of such magnitude include airport terminals, concourses, fueling, air traffic control, AeroTrain, utility buildings, baggage handling systems, jet bridges, parking structures, lighting systems, etc. Local generation to supply back-up electric and thermal loads with a clean, energy efficient and sustainable solution is desired. The Airports Authority seeks to understand the feasibility of utilizing a Combined Heating and Power (CHP) solution and its impact in reducing Dulles’ overall energy cost while providing reliable and sustainable back-up power. It is anticipated the CHP unit will be located on Airport property in close proximity to the Airport Utility Buildings.
- Objective:
- The Airports Authority has issued this RFI to gain information on current industry practices that will meet Airports Authority requirements for implementation and sustainment of a CHP solution ranging from 15-20 megawatts. The Airports Authority is seeking qualified expertise and perspective demonstrating the successful performance of feasibility studies, development of design documents, construction and operation of CHP plants at other airports and or facilities similar in size and complexity.
Registration & Planholders List
- Details:
- Show your interest in this solicitation by registering as a Planholder.
Registration will place your name on the Planholder List for this project and ensure that you receive notification of any amendments or other updates to the project which may be issued in the future. - Registration:
- CLICK HERE TO REGISTER
Please enter "RFI-CHP Dulles" in the Solicitation Number field. - Planholder List:
- Planholder List - May 25, 2017 (8 KB)
Solicitation Documents
- Registration:
- If you download the solicitation documents and are interested in submitting a response, please register as a planholder by clicking on the "Registration & Planholders" tab above and following the instructions.
PLEASE NOTE: If you fail to register, you will not receive notification of amendments, and failure to receive and acknowledge amendments may result in your submission being deemed non-conforming. - Base Solicitation Documents:
- RFI for a Combined Heat and Power Solution at Dulles Airport (50 KB)
Help and Technical Assistance
- File Formats:
- Documents are in one or more of the following formats:
Adobe Acrobat PDF - Requires Adobe Reader version 5.0 or later.
You can download the latest version of Adobe Acrobat Reader free of charge by clicking on the following link: Download Acrobat Reader
Microsoft Excel - Requires Microsoft Excel 2000 or later.
Microsoft Word - Requires Microsoft Word 2000 or later. - Technical Assistance:
- If you have any technical questions or need assistance with the document download process, please contact us via e-mail at [email protected] or call 703-417-8672.
Last Updated May 25, 2017
The documents posted on this page and the information contained therein shall not be published or redistributed in any medium without prior written consent of the Metropolitan Washington Airports Authority.