The Airports Authority has issued the following contracting opportunities:
Construction Opportunities
RFP-24-28936: CMR Services for Concourse E/F, FIS, Utility Development and Expansion Work, IAD NEW
Description: The Airports Authority is seeking Construction Manager at Risk (CMR) services at Washington Dulles International Airport (IAD) to increase the airport gate capacity and improve the level of service for passengers on domestic and international flights. The work is expected to occur over 10 years and consists of the following services: Concourse E/F that will be an extension of the Tier 2 Concourse-East project that is currently under construction, and will support approximately an additional 24 narrow body and 12 wide body gates using Multiple Aircraft Ramp System (MARS); a new Federal Inspection Station (FIS) built integral with Concourse E/F; Utility Development to include systems for chilled and hot water production, distribution and storage, and electrical facilities and infrastructure; Additional Work for Expansion that may include but is not limited to security, wayfinding, technology infrastructure, utilities infrastructure, aircraft fueling facilities, airfield capacity enhancements, airfield pavements, electrical vehicle support infrastructure, and environmental sustainability.
Solicitation Issue Date: December 17, 2024
Due Date for Submissions: January 30, 2025
Amendments Issued: None
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System
RFP-24-27373: Reconstruct Taxilane D, Taxiway F, and Taxiway Z, IAD UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision to provide construction services to reconstruct Taxilane D (Middle), Taxilane F (West), and Taxiway Z (South) at Washington Dulles International Airport (IAD). Work includes but not limited to: Implementation of a phasing and maintenance of traffic plan throughout all phases of construction; Pollution prevention plan throughout all phases of construction; Full depth removal of asphalt and concrete pavements; Construction of new full depth PCC pavement including stabilized base course; Construction of new bituminous shoulder pavements; Installation of new underdrain piping and structures; Permanent and temporary airfield lighting and electrical work and removal and installation of permanent and temporary airfield pavement markings.
Solicitation Issue Date: November 22, 2024
Due Date for Submissions: January 7, 2025
Amendments Issued: One
DBE Requirement: 30%
Additional Information - See in MWAA Contract Lifecycle Management System
IFB-24-26854: Replacement of HVAC System at Paint Shop, IAD UPDATED
Description: The Contractor shall provide all supervision, labor, equipment, materials, vehicles, fuel, tools, and transportation required to perform the replacement of the heating, ventilation and air-conditioning system at the Paint (Autobody) Shop at Washington Dulles International Airport (IAD).
Solicitation Issue Date: November 6, 2024
Due Date for Submissions: December 27, 2024
Amendments Issued: One
SLBE Requirement: 100%
Additional Information - See in MWAA Contract Lifecycle Management System
Design/Build Opportunities
RFP-24-27192: Design-Build Services for Passenger Boarding Bridges, DCA & IAD NEW
Description: The Airports Authority is seeking one or more Contractors to provide a turnkey solution for the design, fabrication, installation, and commissioning of a fully integrated and compatible passenger boarding bridge system at Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport (DCA).
Solicitation Issue Date: December 18, 2024
Due Date for Submissions: January 23, 2025
Amendments Issued: None
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System
Architectural & Engineering Opportunities
RFQI-24-26594: Design & Planning for Terminal 1 & South Area Redevelopment Program, DCA UPDATED
Description: The Contractor shall provide design and support services, stakeholder coordination, program cost control, program scheduling, phasing and engineering for the Terminal 1 and South Area Redevelopment Program at Ronald Reagan Washington National Airport (DCA). Anticipated projects include but are not limited to a new nine-gate concourse and apron, new terminal headhouse and various enabling and South Area Development projects.
Solicitation Issue Date: November 8, 2024
Due Date for Submissions: December 23, 2024
Amendments Issued: One
SLBE Requirement: 35%
Additional Information - See in MWAA Contract Lifecycle Management System
Services Opportunities
RFQ-24-27207: Emergency Flood and Fire Remediation Services, DCA NEW
Description: The contractor shall provide emergency remediation services for flood, fire, and mold incidents at Ronald Reagan Washington National Airport (DCA).
Solicitation Issue Date: December 12, 2024
Due Date for Submissions: January 12, 2025
Amendments Issued: None
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System
RFQ-24-26815: HVAC Cooling Tower Overhaul Services, DCA UPDATED
Description: The Contractor shall provide HVAC cooling tower overhaul services for Terminal 1 at Ronald Reagan Washington National Airport (DCA).
Solicitation Issue Date: November 19, 2024
Due Date for Submissions: January 2, 2025
Amendments Issued: One
SLBE Requirement: 100%
Additional Information - See in MWAA Contract Lifecycle Management System
Goods and Equipment Opportunities
RFQ-24-26301: Modular Shoot Houses, IAD
Description: The Contractor shall provide a portable shoot house with a modular, easy to set up design, for use by the Airports Authority's police officers. Items will be delivered to the MWAA Police Department Public Safety Firing Range Training Facility at Washington Dulles International Airport (IAD).
Solicitation Issue Date: December 6, 2024
Due Date for Submissions: December 30, 2024
Amendments Issued: None
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System
Concessions Opportunities
RFP-24-24307: International Currency Exchange, IAD UPDATED
Description: The Contractor shall provide foreign currency exchange and business services to the passengers and tenants of Washington Dulles International Airport (IAD).
Solicitation Issue Date: November 13, 2024
Due Date for Submissions: January 3, 2025
Amendments Issued: Two
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System
Dulles Corridor Metrorail Project Opportunities
Project Overview - Dulles Corridor Metrorail Project
Phase One of the Dulles Corridor Metrorail Project constructed the new Metrorail Silver Line from the East Falls Church station on the Orange Line, through Tysons Corner and on to Wiehle Avenue in Reston. Phase Two will continue the line to Dulles International Airport and into Loudoun County.
Dulles Corridor Metrorail Project - Phase Two
Capital Rail Constructors, a joint venture of Clark Construction Group and Kiewit Infrastructure South, is the Metropolitan Washington Airports Authority's design-build contractor for Phase Two of the Dulles Corridor Metrorail Project, which will build 11.4 miles of track and six stations in Fairfax and Loudoun counties. Construction of Phase Two began in 2013 and will continue through 2018.
The following link will take you to the Capital Rail Constructors website where you can learn about subcontracting opportunities for Phase Two of the Dulles Corridor Metrorail Project:
Capital Rail Constructors Subcontracting Information
Additional Dulles Corridor Metrorail Project Contracting Opportunities
The Metropolitan Washington Airports Authority has issued the following additional contracting opportunities for the Dulles Corridor Metrorail Project:
None