Dulles International Airport
- D2 Dulles Development
- Projects
- Parking Garages
- Z-Gates
- Runway 12-30 Reconstruction
- Passenger Walkway
- Parking Garages
- Airport Traffic Control Tower
- Roadway Improvements
- Future Fifth Runway
- Fourth Runway
- Main Terminal AeroTrain Station
- AeroTrain System
- Main Terminal Improvement Project
- Concourse B Expansion
- Concourse C/D
- AeroTrain Maintenance Facility
- IAB Expansion
- About D2
- AeroTrain Exhibit
- D2 Photo Galleries
- D2 Home
D2 Projects: Main Terminal AeroTrain Station
![]()
The Main Terminal AeroTrain Station represents a major expansion on the airfield side of the Main Terminal. But since it was constructed about 60 feet below ground, views of the Main Terminal will remain unblocked. The station spans the entire length of the Main Terminal (about 1,600 feet) and has four distinct levels:
-
Departures (49,600 square feet)
-
Arrivals (49,600 square feet)
-
Security Mezzanine (121,700 square feet)
-
AeroTrain Platform (54,500 square feet)
Moving passenger screening operations to the new Security Mezzanine will alleviate congestion from the previous screening location on the Main Terminal ticketing level. The mezzanine is also directly accessible from other parts of the Airport including Baggage Claim and the parking facilities.
The AeroTrain platform is a "side-center-side" arrangement. Passengers heading to flights will be able to board the train from the center platform immediately after people arriving on the train step onto the side platforms.
Despite its underground location, the design of the station is very open and allows natural light to filter in. There is an extensive system of skylights at roof level, which is level with the ground outside. Trains entering and exiting the station will travel through glass enclosures. Two elevators in the station will have the appearance of vertical glass tubes. Completion of the station is scheduled to coincide with the opening of the AeroTrain System later in 2009.
Statistics about the Main Terminal AeroTrain Station:
-
Platform Level Dimensions: 440 feet long x 120 feet wide x 39 feet high
-
Waiting time between trains: Approximately 2 minutes
Construction Information:
-
Design Contractor: Skidmore, Owings and Merrill
-
Construction Contractor: Turner Construction Company
Click here for a printable factsheet about this project (PDF document)
Click below for related information:
- AeroTrain system map - fullsize jpeg
- Construction Photo Gallery for this project
- View the AeroTrain video showing a virtual tour of the future system
- AeroTrain project factsheet - PDF document
- AeroTrain System webpage
- AeroTrain Exhibit on display in the Main Terminal
- AeroTrain Maintenance Facility webpage