Current Opportunities - Construction
The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:
RFP 1-08-C190: Crushed Concrete Operations, Dulles Airport UPDATED!
 |
Description: The Contractor shall provide all labor, supervision, tools, equipment, and materials to perform concrete crusing operations at Washington Dulles International Airport. |
 |
Issue Date: June 27, 2008 |
 |
Due Date for Proposals: July 29, 2008 |
 |
Amendments Issued: One |
 |
LDBE Requirement: 100% |
 |
Project Overview |
 |
Download Documents |
RFP 1-08-C191: Soil Bank Management, Dulles Airport
 |
Description: The Contractor shall provide all labor, supervision, tools, equipment, and materials to perform grading work at the soil stockpile area at Washington Dulles International Airport. |
 |
Issue Date: June 27, 2008 |
 |
Due Date for Proposals: July 29, 2008 |
 |
Amendments Issued: None |
 |
LDBE Requirement: 100% |
 |
Project Overview |
 |
Download Documents |
RFP 1-08-C200: NOAA Equipment Relocation Project, Dulles Airport UPDATED!
 |
Description: The Contractor shall furnish all necessary labor, material, tools, equipment and supervision for the dissassembly, packing, transporting, unpacking, reassembly, testing and final documentation of various electronic systems as part of the NOAA Relocation Project. Equipment shall be relocated from the current facility at Washington Dulles International Airport to the newly constructed NOAA/NWS facility in Sterling, Virginia. |
 |
Issue Date: June 20, 2008 |
 |
Due Date for Proposals: July 22, 2008 |
 |
Amendments Issued: One |
 |
LDBE Requirement: 30% |
 |
Project Overview |
 |
Download Documents |