Metropolitan Washington Airport Authority

RFP 1-08-C205: Airside Service Road Rehabilitation, Dulles Airport

|
PROJECT OVERVIEW
|
|
RFP Issue Date: July 28, 2008
Deadline for Proposals: 1:00 PM (Eastern), August 29, 2008
Pre-Proposal Conference: 10:00 AM (Eastern), August 11, 2008 at Conference Room A, Second Floor, 45045 Aviation Drive, Dulles Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $250,000 - $500,000
Project Duration: 210 days from Notice to Proceed
Bond Requirements: 100% Paymemt and Performance Bonds
Fee for Plans: $50.00 for printed documents; free download
Project Summary:
The Contractor shall furnish all necessary labor, material, tools, equipment and supervision to replace the concrete road west and south of the Engineering & Maintenance Buioldings located inside the Airfield Operations Area (AOA) at Washington Dulles International Airport.
LDBE Requirement:
This RFP has a 100% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 100% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
238110 Poured Concrete Foundation Contractors $13.0 Million
238910 Site Preparation Contractors $13.0 Million
Amendments Issued:
None
Last Updated August 14, 2008